1. Overview: Gas Steam Boiler Prices in Uzbekistan

The cost of a gas steam boiler in Uzbekistan varies widely depending on:

  • Capacity (TPH / tons per hour)
  • Boiler type & design
  • Automation & control systems
  • Manufacturer / brand
  • Accessories & installation package

Typical installed gas steam boiler cost ranges for Uzbekistan factories:
👉 Small & medium industrial sizes: From ~$20,000 to $150,000+ USD
👉 Large industrial steam systems: Up to $600,000+ USD for 20 TPH+ custom water‑tube systems


2. Estimated Gas Steam Boiler Price by Capacity (Ex Works)

Boiler Size (Steam Output)Estimated Cost (USD)Typical Use
500 kg/h (~0.5 TPH)$12,000 – $20,000Small laundries, boiler demos
1 TPH$20,000 – $30,000Workshops, small hotels
2 TPH$25,000 – $85,000Medium factories
4 TPH$60,000 – $150,000Larger industrial plants
6 TPH$90,000 – $220,000Textile, food, chemical plants
10 TPH$140,000 – $300,000Large manufacturing & district steam
20 TPH+$250,000 – $600,000+Central boiler houses or large industrial complexes

Prices are for the boiler unit itself and do not include installation, piping, water treatment, or control panel systems unless specified in the quote.


3. What’s Included (and Not Included) in a Boiler Quote

Included in Most OEM Quotes

âś… Boiler vessel and burners
âś… Basic combustion and safety controls
âś… Insulation & casing
âś… Standard fuel train components
âś… Factory testing

Typically NOT Included

❌ Installation & commissioning
❌ Site piping & valves
❌ Water treatment equipment
❌ Chimney / flue stack accessories
❌ Electrical cabinets & sensors
❌ Compliance testing in Uzbekistan

👉 Installation & setup costs can add 10–20%+ of boiler price, depending on site complexity and fuel piping conditions.


4. Factors That Influence Cost in Uzbekistan

(a) Capacity & Design

Larger boilers require:

  • Bigger vessels
  • Multiple passes or water‑tube design
  • Higher pressure capabilities

👉 Prices rise non‑linearly with capacity increases.

(b) Automation & Controls

Fully automated PLC control with remote monitoring costs more than basic manual systems.

(c) Pressure & Temperature Requirements

High‑pressure or high‑temperature steam designs are more expensive than low‑pressure units.

(d) Fuel Quality & Burner Type

Premium gas burners with modulating control increase upfront cost but improve efficiency.

(e) Export & Import Costs

  • Import duties, transportation, and customs clearance
  • Costs to deliver to Uzbekistan cities like Tashkent, Samarkand, Bukhara

These can add both time and cost to the final landed price.


5. Installation & Commissioning Costs (Uzbekistan Context)

Typical Installation Components

  • Site preparation
  • Foundation & grouting
  • Fuel piping and gas regulation system
  • Steam pipelines and header
  • Water softening & treatment
  • Safety devices & controls

💡 A typical installation budget for industrial boilers is 10–20% of the boiler cost, sometimes higher for complex setups.

Example:
A 4 TPH gas boiler priced at $100,000 may require
$10,000–$20,000+ in installation & commissioning.


6. Operational Costs You Should Budget

Even after purchase and installation, total lifecycle cost includes:

(a) Fuel (Natural Gas)

Natural gas is typically the largest ongoing cost. Uzbekistan factories benefit from relatively low industrial gas tariffs compared to imports.

(b) Water Treatment Chemicals

Hard water can damage boiler internals. Budget for water treatment systems and consumables.

(c) Maintenance

Regular safety checks, burner services, and annual inspections.


7. Payback & ROI Considerations

Even though gas boilers can have a higher upfront price than smaller electric or diesel options, they are usually more fuel‑efficient and cost‑effective over time because:
âś” Lower fuel cost per kg of steam
âś” Longer service life
âś” Better performance in continuous operation

A simple payback analysis often shows ROI within 2–4 years for factories with high steam demand when replacing very old or inefficient boilers.


8. How to Get the Best Price in Uzbekistan

🔎 1. Calculate Steam Demand First

Sizing too large wastes fuel. Too small risks capacity bottlenecks.

đź“„ 2. Ask for Detailed Breakdown

Ensure quotes include:

  • Boiler unit
  • Burner brand
  • Controls & automation
  • Warranty and after‑sales support

đź’Ľ 3. Compare Multiple Quotes

Local suppliers and Chinese exporters often offer competitive pricing.

📦 4. Include Installation Early

Quotes that lump boiler + installation give clarity on total investment.

đź’° 5. Consider Hybrid Options

For larger plants with biomass access, hybrid gas + biomass systems may lower long‑term cost.


9. Example Market Price Signals

Imported industrial gas steam boilers have been recorded in Uzbekistan trade data:

  • A 20 TPH gas steam boiler (SZS20) recorded at $134,000 – $181,000+ USD per unit in 2025 trade data, with part deliveries logged through customs records.

Conclusion: What You Can Expect (2026 Prices)

💡 Small to Medium Boilers (~1–4 TPH): $20,000 – $150,000+
💡 Medium to Large Boilers (~6–10 TPH): $90,000 – $300,000+
💡 Industrial Complex Boilers (>10 TPH): $250,000 – $600,000+

Final price depends on your capacity needs, automation level, installation complexity, and delivery terms.


👉 Call to Action

Want an exact quote for your factory in Uzbekistan?
Tell us:
âś” Required steam capacity (TPH)
âś” Operating pressure & fuel (gas)
âś” Installation location
âś” Any automation preferences

We’ll send a customized price estimate + delivery timeline + ROI comparison.